Sunday, October 11, 2015

The Mazda Miata makes for a great electric conversion.  EV4Unow.com
Remember to follow EV4U on YouTube.  www.youtube.com/ev4ucustomconversion/Visit our website at EV4Unow.com also.  EV4Unow.com
EV4U is best known for their VW and Porsche conversions.  But we convert all vehicles as well as boats and ATV's.

Wednesday, April 15, 2015

Karmann doesn't normally charge in public, but decided to try out the new Envision Solar EV Charger in downtown Shasta Lake, California.

Equipped with one Level II J1772 charge cord and a GFI 120 volt outlet, the Envision Solar EV Charger is centrally located on the main drag of town (Shasta Dam Blvd.).


Karmann normally charges using 120 volts, so she plugged in and tasted solar charging for the first time.  Now to find a way to move this thing closer to the shop, so she is out of the sun, but charging from sunshine.

Now to convince the City that Level III Fast Charging is the game changer.  Of course I have been telling them that for years.  I guess this will have to do for now.  EV4U offered free Level II charging at our shop for years.
Ordered in June of 2014, the Envision Solar EV ARC arrives in Shasta Lake, California in April 2015.

Here is the press release from Envision dated 8/28/14.

City of Shasta Lake Deploys Envision Solar EV ARC™
- Shasta Lake Features the Envision Solar EV ARC™ Standalone Solar Charging Station at the City’s Grand River municipal parking lot on Shasta Dam Boulevard
 
SAN DIEGO, CALIF. – August 28th 2014 –  Envision Solar International, Inc., (OTCQB: EVSI) ("Envision Solar," or the "Company"), the leading renewable energy Media and Branding, and EV charging product company, announced today that the City of Shasta Lake, California has initiated their electric vehicle charging program with the installation of an Envision Solar EV ARC™ standalone Solar Charging Station. This fully renewably energized EV charger will be located at the City’s Grand River municipal parking lot on Shasta Dam Boulevard and will be available free of charge to the public. The EV ARC™ will be equipped with a standard Level II EV charger and power outlets to enable electric wheelchair charging.

The EV ARC™ is a cost-effective, easy-to-install, standalone solar charging station that requires no engineering, foundation, trenching, building permit or grid connection. Invented, engineered and manufactured in the United States, the EV ARC™ fits inside a standard parking space and generates enough renewable energy to provide an average of 55 and as many as over 100 electric miles each day. The energy is stored and ready for use in the 22 kWh on-board battery storage. The system's clean solar electrical generation is enhanced by the patented EnvisionTrak™ sun tracking system, enabling the solar array to follow the sun, generating 18 to 25 percent more electricity than a conventional fixed array.
The City of Shasta Lake is a pristine community located on the Interstate 5 corridor just north of Redding in northern California. The proximity of the EV ARC™ to Interstate 5 will contribute to Governor Brown’s initiative to create EV charging infrastructure on California’s Interstate system.
Tom Miller, Assistant City Manager and Electric Utility Director for the City of Shasta said, "Clean and reliable energy is very important to the City of Shasta and so is being ready for the rapid growth in EV adoption. We were very happy to find this unique product, which solves so many of the challenges associated with EV charger deployments and has no negative environmental impact. The fact that Envision Solar is a Californian company with American made, environmental sustainability products means that this is a win for the people of Shasta and California."

"This deployment in Shasta Lake further demonstrate the value of the EV ARC,” said Desmond Wheatley, CEO of Envision Solar. “It was not economically feasible to run trenching and grid connections to this important location but the EV ARC delivers EV charging where traditional chargers cannot. Additionally, this will be the first EV ARC to offer electric wheelchair charging, something we are very proud of. We are delighted to have the City of Shasta as a customer and look forward to working with them and other cities to deliver renewably energized EV charging without the difficult or sometimes impossible tasks associated with tying to the grid.”

Wednesday, February 4, 2015

For a Limited Time

EV4U will install our Custom VW Shift Rod Bushing for FREE with the purchase of the Custom VW Shift Rod Bushing Kit and Installation Kit Combo.  Contact EV4U for an appointment.  Installation provided at our Shasta Lake, California shop only.  Visit EV4Unow.com
See why
Gas is NEVER Cheap!

Visit EV4Unow.com

Sunday, January 11, 2015

Custom
VW Shift Rod Bushing

Fits:
VW Bug 1949-74
VW Ghia 1956-74
VW Bus 1950-66
VW Thing 1973-74

Only from www.EV4Unow.com

Guaranteed for as long as you own your car.
Richard shares a few reasons why he likes electric conversions.
http://youtu.be/AfeHKBYHN7c





 



Now that the Show and Event season is behind us, we will be doing some repairs, maintenance, and improvements to our Karmann Ghia.
In regards to repairs, we will be replacing the transaxle. For improvements, we will be adding rear disc brakes. Follow us on YouTube. http://youtu.be/mzx1yylwFEA

Monday, May 12, 2014

The GM EV 1

 The General Motors EV 1

Featured in the movie "Who Killed the Electric Car?"  The EV 1 was produced from 1996-1999.
Only 1,117 were produced.  They originally were leased only in Southern California and Arizona.  San Francisco, Sacramento, and Atlanta, Georgia were later added.  The cars were never sold, only leased, through Saturn dealerships.  Only about 40 exist today.  Check out the movie to see why. 


Sunday, March 30, 2014

Taking it on the road

EV4U is taking their popular EV Conversion Workshops on the road.  Starting Summer 2014, EV4U will be offering one day Conversion Workshops in the SF Bay Area.  Exact dates and locations are yet to be determined, but we are seeking feedback regarding what day of the week and location is most desired by future participants.
Email us at EV4Uinc@yahoo.com with your preference.  Visit EV4Unow.com for more information regarding our Workshops.

Thursday, December 12, 2013

New for 2014
This Sandrail will be used in our 3-Day Hands-On Conversion Workshops.  Participants will convert it to electric and then test drive it on our test track.  Also for 2014, EV4U has increased the number of Workshops to ten, up from four per year in the past.  Visit EV4Unow.com and sign up today.

Tuesday, November 5, 2013

It's not just batteries that have changed, but also chargers.
Check out this early GE unit.

Monday, November 4, 2013

The 1914 Detroit Electric featured 68 batteries and had a range between 50 and 85 miles.  Cost new, $2,500.

Sunday, November 3, 2013

This pump was built on September 22, 1930.  By the late 1920s, electric meter-type pumps were rapidly replacing the visible-register models.  Loosely known as clock-face pumps.  Remember, you don't need no stinkin gas.  EV4U can show you how to stop using gas.  www.EV4Unow.com

Saturday, November 2, 2013

This is an example of a visible pump that was built in 1924.  These pumps first appeared around 1915.  Gasoline was pumped from underground tanks into a visible glass cylinder above the pump.  The operator watched the level of gas in the cylinder and stopped the flow when the gas reached the desired amount.
You don't need no stinkin gas.  EV4U can help.
info@EV4Unow.com