New for 2014
This Sandrail will be used in our 3-Day Hands-On Conversion Workshops. Participants will convert it to electric and then test drive it on our test track. Also for 2014, EV4U has increased the number of Workshops to ten, up from four per year in the past. Visit EV4Unow.com and sign up today.
Thursday, December 12, 2013
Monday, November 11, 2013
New Electric Delta and Silverback: EV powerboats from Amsterdam (+playlist)
http://www.youtube.com/v/Nh8Xjo0RxOY?version=3&list=UUsoz2izhGltjay4Tl2niPSQ&autoplay=1&showinfo=1&attribution_tag=XWU9UgV0UTEVDB5O5DTL8A&feature=share&autohide=1
Monday, November 4, 2013
Sunday, November 3, 2013
Saturday, November 2, 2013
This is an example of a visible pump that was built in 1924. These pumps first appeared around 1915. Gasoline was pumped from underground tanks into a visible glass cylinder above the pump. The operator watched the level of gas in the cylinder and stopped the flow when the gas reached the desired amount.
You don't need no stinkin gas. EV4U can help.
info@EV4Unow.com
You don't need no stinkin gas. EV4U can help.
info@EV4Unow.com
Subscribe to:
Posts (Atom)